۱- د پورته کولو دنده وټاکئ
د ثبت بار، د دروندتیا مرکز، د پورته کولو ځایونه، لاره، د کښته کولو ساحه، فریکونسۍ، چاپیریال او د ناکامۍ پایلې.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
د نوملړ شوي تجهیزاتو غوره کول
د کار د خوندي بار، ترتیب، لاسرسی، دنده، ملاتړ، هکونه، د رګونو، زنځیرونه، سلاګونه، بندونه، بریکونه، کنټرولونه او چاپیریال محدودیتونه وګورئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۳. د وړتیا تصدیق کول
د کاروونکو، سلائنګونو، سیګنالونو، څارونکو، انسپکټرانو او ساتونکو لپاره روزنه او جواز تعریف کړئ. د پیښو، بدلونونو یا اوږد غیبت وروسته وړتیا تازه کړئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
د کارولو دمخه معاینه کړئ.
د جوړښت، هوکونو، لاکونو، پنونو، رګونو، زنځیرونو، کنټرولونو، بریکونو، د محدودیت وسیلو، لیبلونو، الارمونو او ملاتړونو چیک کړئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۵. د خلکو او ترافیکو کنټرول
د مخنیوي زونونو، خنډونو، نښو، رڼاګانو، نښه کونکو، روښانه سیګنالونو او کنټرول شوي موټرو لارې وکاروئ. د ځنډول شوي بارونو او د ماتولو ځایونو ته نږدې د لاسرسي مخه ونیسئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
د پلان سره سم عمل وکړئ
د ازموینې لیفټ، سمه حرکت، کنټرول شوي سرعت، مستحکم کښته کول، او موافقه. کله چې تجهیزات، د بار چلند، شرایط یا پرسونل له پلان څخه توپیر ولري، ودریږئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۷. ساتنه او څېړنه
د مخنیوي ساتنې، غوړولو، ازموینې، قانوني معاینه، او د عیبونو د ځواب لپاره وقفې ټاکي. سندونه، موندنې، ترمیمونه، برخې، او وړ لاسلیک وساتئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۸. زده کړه او پرمختګ
د زياتو بارونو، غورځېدلو بارونو، ټکرونو، نژدې تېروتنو، ناڅاپي حرکتونو او تکراري نیمګړتیاوو په اړه څېړنه وکړئ. د تدارکاتو، ساتنې، روزنې، پلانونو او تفتیش کنټرولونه تازه کړئ.
A documented lift plan should identify the load, centre of gravity, lifting points, route, landing area, weather limits, nearby work, and the person authorised to stop the operation. Review the plan whenever the load, equipment, crew, location, or conditions change. A short pre-lift briefing confirms roles and signals.
Selection should be based on rated capacity in the actual configuration, not on a catalogue maximum. Check reach, duty cycle, supports, headroom, accessories, hooks, ropes, chains, slings, shackles, brakes, controls, guards, alarms, and environmental limits. Compatibility and traceability are procurement requirements.
Before every use, competent personnel should inspect structural members, hooks, latches, pins, ropes, chains, drums, brakes, limit devices, controls, labels, and emergency stops. Record findings, isolate defects, identify quarantined equipment, and prevent accidental return to service until a competent person releases it.
The work zone should prevent access beneath suspended loads and protect people from crush, shear, swing, dropped-object, and vehicle-interface hazards. Use barriers, signs, spotters, lighting, controlled traffic, and reliable communication. Stop the lift when visibility, wind, ground conditions, or communication become unsafe.
Operators should use smooth movements, a controlled test lift, agreed signals, and a clear landing sequence. Do not side-load hooks, drag loads, defeat limiters, exceed capacity, or allow unauthorised changes. A stop-work decision is a normal control, not a failure of production planning.
Maintenance and statutory examination should follow manufacturer instructions, legal duties, risk assessment, and equipment history. Retain certificates, test results, lubrication records, repairs, parts, defects, and competent sign-off. Trend recurring findings to improve design, training, purchasing, and preventive intervals.
Incident learning should include dropped loads, overloads, collisions, near misses, unexpected movement, damaged accessories, and repeated inspection findings. Preserve evidence, involve operators, identify system causes, and update the lift plan, exclusion controls, competence checks, and emergency arrangements.
Management should review lifting performance using leading indicators such as completed inspections, overdue examinations, defect closure time, briefing quality, stop-work events, training currency, and supplier performance. Evidence-based review keeps lifting equipment reliable and makes safe decisions repeatable across every site and shift.
A documented lift plan should identify the load, centre of gravity, lifting points, route, landing area, weather limits, nearby work, and the person authorised to stop the operation. Review the plan whenever the load, equipment, crew, location, or conditions change. A short pre-lift briefing confirms roles and signals.
Selection should be based on rated capacity in the actual configuration, not on a catalogue maximum. Check reach, duty cycle, supports, headroom, accessories, hooks, ropes, chains, slings, shackles, brakes, controls, guards, alarms, and environmental limits. Compatibility and traceability are procurement requirements.
Before every use, competent personnel should inspect structural members, hooks, latches, pins, ropes, chains, drums, brakes, limit devices, controls, labels, and emergency stops. Record findings, isolate defects, identify quarantined equipment, and prevent accidental return to service until a competent person releases it.
The work zone should prevent access beneath suspended loads and protect people from crush, shear, swing, dropped-object, and vehicle-interface hazards. Use barriers, signs, spotters, lighting, controlled traffic, and reliable communication. Stop the lift when visibility, wind, ground conditions, or communication become unsafe.
Operators should use smooth movements, a controlled test lift, agreed signals, and a clear landing sequence. Do not side-load hooks, drag loads, defeat limiters, exceed capacity, or allow unauthorised changes. A stop-work decision is a normal control, not a failure of production planning.
Maintenance and statutory examination should follow manufacturer instructions, legal duties, risk assessment, and equipment history. Retain certificates, test results, lubrication records, repairs, parts, defects, and competent sign-off. Trend recurring findings to improve design, training, purchasing, and preventive intervals.
Incident learning should include dropped loads, overloads, collisions, near misses, unexpected movement, damaged accessories, and repeated inspection findings. Preserve evidence, involve operators, identify system causes, and update the lift plan, exclusion controls, competence checks, and emergency arrangements.
Management should review lifting performance using leading indicators such as completed inspections, overdue examinations, defect closure time, briefing quality, stop-work events, training currency, and supplier performance. Evidence-based review keeps lifting equipment reliable and makes safe decisions repeatable across every site and shift.
۹. سرچینې او نور لوستل
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.