۱- د کارونې او فعالیت تعریف کول
د دروازې د غوره کولو دمخه د موقعیت، ترافیک، ابعادو، د اور ستراتیژۍ، اکوستیکي اړتیاوو، تودوخې سره مخامخ کیدو، د خوندیتوب کچه، لاسرسي وړتیا، رطوبت او تمه شوې خدمت ژوند ثبت کړئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
د تطابق وړ برخې مشخص کړئ
د پاڼې، چوکاټ، کنډکونه، قفلونه، بندونه، مهرونه، حدونه، شیشې، هارډویر، ټینګښتونه، او پایونه. د دیوالونو، پوړونو، الارمونو او د لاسرسي کنټرول سره د تولید کونکي محدودیتونه او انٹرفیسونه وګورئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۳. د پرانیستلو لپاره چمتو شئ
د نصب کولو دمخه عیبونه سم کړئ، نه چې د تنظیم سره پټ کړئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
په خوندي او دقیق ډول نصب کړئ
د دې لپاره چې د مرستې لپاره د چټکۍ لارې وکاروئ، د چټکۍ لارې وکاروئ او د غبار، شور او لنډمهاله پرانیستلو کنټرول وکړئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۵. د فعالیت او لاسرسي د تایید
د ازموینې سمون، د تړلو ځواک، تړل، مهرونه، حدونه، د لید پینلونه، لاسونه، روښانه عرض، نښه او لاسرسي وړ هارډویر. د دروازې د عادي او اضطراري شرایطو لاندې د باور وړ کار کوي.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۶. د هوا او امنیت ساتنه
د اوبو د څښلو، چټکتیا، سیل کولو، ډرینج، د قفلونو ساتنه، د سلنډر امنیت، شیشې کول، او د ځواکمن ننوتلو مقاومت وګورئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۷. په منظم ډول ساتنه
د تفتیش، غوړولو، تنظیم، مهر بدلولو، نږدې ازموینې، د قفلونو ساتنه، repainting، او د عیبونو د ځواب وخت نیسي. د محصول ریکارډونه، سندونه، تضمینونه، او ترمیمونه وساتئ.
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.
۸. له ناکاميو څخه زده کړه
د نښلولو، ډرافټونو، لیکونو، ټکرونو، مات شوي هارډویر، د لاسرسي کنټرول ناکامه، زیانونه، او تکرار شوي کالونه وڅیړئ. مشخصات، د نصب تفصیلات، روزنه او ساتنه ښه کړئ.
A documented lift plan should identify the load, centre of gravity, lifting points, route, landing area, weather limits, nearby work, and the person authorised to stop the operation. Review the plan whenever the load, equipment, crew, location, or conditions change. A short pre-lift briefing confirms roles and signals.
Selection should be based on rated capacity in the actual configuration, not on a catalogue maximum. Check reach, duty cycle, supports, headroom, accessories, hooks, ropes, chains, slings, shackles, brakes, controls, guards, alarms, and environmental limits. Compatibility and traceability are procurement requirements.
Before every use, competent personnel should inspect structural members, hooks, latches, pins, ropes, chains, drums, brakes, limit devices, controls, labels, and emergency stops. Record findings, isolate defects, identify quarantined equipment, and prevent accidental return to service until a competent person releases it.
The work zone should prevent access beneath suspended loads and protect people from crush, shear, swing, dropped-object, and vehicle-interface hazards. Use barriers, signs, spotters, lighting, controlled traffic, and reliable communication. Stop the lift when visibility, wind, ground conditions, or communication become unsafe.
Operators should use smooth movements, a controlled test lift, agreed signals, and a clear landing sequence. Do not side-load hooks, drag loads, defeat limiters, exceed capacity, or allow unauthorised changes. A stop-work decision is a normal control, not a failure of production planning.
Maintenance and statutory examination should follow manufacturer instructions, legal duties, risk assessment, and equipment history. Retain certificates, test results, lubrication records, repairs, parts, defects, and competent sign-off. Trend recurring findings to improve design, training, purchasing, and preventive intervals.
Incident learning should include dropped loads, overloads, collisions, near misses, unexpected movement, damaged accessories, and repeated inspection findings. Preserve evidence, involve operators, identify system causes, and update the lift plan, exclusion controls, competence checks, and emergency arrangements.
Management should review lifting performance using leading indicators such as completed inspections, overdue examinations, defect closure time, briefing quality, stop-work events, training currency, and supplier performance. Evidence-based review keeps lifting equipment reliable and makes safe decisions repeatable across every site and shift.
A documented lift plan should identify the load, centre of gravity, lifting points, route, landing area, weather limits, nearby work, and the person authorised to stop the operation. Review the plan whenever the load, equipment, crew, location, or conditions change. A short pre-lift briefing confirms roles and signals.
Selection should be based on rated capacity in the actual configuration, not on a catalogue maximum. Check reach, duty cycle, supports, headroom, accessories, hooks, ropes, chains, slings, shackles, brakes, controls, guards, alarms, and environmental limits. Compatibility and traceability are procurement requirements.
Before every use, competent personnel should inspect structural members, hooks, latches, pins, ropes, chains, drums, brakes, limit devices, controls, labels, and emergency stops. Record findings, isolate defects, identify quarantined equipment, and prevent accidental return to service until a competent person releases it.
The work zone should prevent access beneath suspended loads and protect people from crush, shear, swing, dropped-object, and vehicle-interface hazards. Use barriers, signs, spotters, lighting, controlled traffic, and reliable communication. Stop the lift when visibility, wind, ground conditions, or communication become unsafe.
Operators should use smooth movements, a controlled test lift, agreed signals, and a clear landing sequence. Do not side-load hooks, drag loads, defeat limiters, exceed capacity, or allow unauthorised changes. A stop-work decision is a normal control, not a failure of production planning.
Maintenance and statutory examination should follow manufacturer instructions, legal duties, risk assessment, and equipment history. Retain certificates, test results, lubrication records, repairs, parts, defects, and competent sign-off. Trend recurring findings to improve design, training, purchasing, and preventive intervals.
Incident learning should include dropped loads, overloads, collisions, near misses, unexpected movement, damaged accessories, and repeated inspection findings. Preserve evidence, involve operators, identify system causes, and update the lift plan, exclusion controls, competence checks, and emergency arrangements.
Management should review lifting performance using leading indicators such as completed inspections, overdue examinations, defect closure time, briefing quality, stop-work events, training currency, and supplier performance. Evidence-based review keeps lifting equipment reliable and makes safe decisions repeatable across every site and shift.
۹. سرچینې او نور لوستل
Operational evidence should be retained with the lift plan: equipment identity, rated capacity, inspection date, defect status, operator competence, briefing record, exclusion-zone check, weather limits, maintenance action, and final sign-off. This record supports safe decisions, repeatable controls, and accountable review.